All screens
42 days

i4F Team Onboarding

Every new i4F team member walks the same onboarding spine — access, environment, a guided domain walk, and a first verified change. Each operational node runs its own checklist instance below. A node's headline verdict is the worst of its steps: one blocked step turns the node red, and a fully-checked node reads green.

Checklists by Node

Ashkelon, Ahmedabad, and Miami each track the same four steps. The pill on each row is that step's traffic light; the pill on each header is the node's rollup.

AshkelonAsia/Jerusalem (IDT)

Validation-engine and keystone-gate ownership.

3/4 - 75%In Progress
  1. Provision access

    SSO, repo read/write, and node VPN granted.

    Done
  2. Bootstrap local environment

    Monorepo installs and the dev-admin cockpit boots clean.

    Done
  3. Walk the validation-engine domain

    Pair through the keystone gate and fixture set with a mentor.

    Done
  4. Land a first verified change

    Open, review, and merge one small PR end to end.

    In Progress
AhmedabadAsia/Kolkata (IST)

Worker pipeline and migration tooling.

2/4 - 50%In Progress
  1. Provision access

    SSO, repo read/write, and node VPN granted.

    Done
  2. Bootstrap local environment

    Monorepo installs and the worker test suite runs green.

    Done
  3. Walk the worker + migrations domain

    Trace a job from enqueue to completion with a mentor.

    In Progress
  4. Land a first verified change

    Open, review, and merge one small PR end to end.

    To Do
MiamiAmerica/New_York (EDT)

Web app, design system, and observability surface.

0/4 - 0%Blocked
  1. Provision access

    SSO, repo read/write, and node VPN granted.

    Blocked
  2. Bootstrap local environment

    Monorepo installs and the web app renders locally.

    To Do
  3. Walk the web + design-system domain

    Tour the UI kit and the cockpit routes with a mentor.

    To Do
  4. Land a first verified change

    Open, review, and merge one small PR end to end.

    To Do

Node checklists are illustrative cockpit project-tracking state authored in src/data/onboarding-steps, not product data. A node reads blocked when any step is blocked, done when every step is checked, and in-progress otherwise.