All screens
12 days

Uploz · Project Status Report

Build Status — for Stakeholders

Generated 30 September 2026 at 11:43 · 12 days to demo target

91%

Headline progress

Blended delivery, sprint-scope and wave completion.

98%

Delivery

118 of 120 scoped tasks landed

88%

Sprint scope

7 of 8 sprints complete

88%

Waves

14 of 16 delivery waves done

17 done1 in progress290 sub-agents · 49 strands5/6 services up

Quality — automated tests

Passing tests and measured coverage per package.

5680passing tests
PackageTestsNotes
validation-engine2374108 files: 6 gates + readiness/ceiling + critical-path/forecast/override/rule-registry/advanced. (+3 todo)
worker77723 files: jobs (readiness/kpi/escalation-tick/escalation/presence), schedulers, dispatch. (+5 skipped)
web938Route handlers, snapshot mapping, authed queries, auth-helpers, rate-limit.
shared-types274Enums, Error Contract (parseRpcResult), contract shapes.
ui865Component render tests + status helpers.
notifications274Dispatcher, channels (email/web-push/sms stub + Twilio), severity.
observability178Logger, timing, error-reporter, analytics, tracing seams.

Delivery waves

Each wave was one dependency-aware parallel agent burst.

FoundationDone

Rails + base packages (orchestrator-built)

  • Monorepo:Turborepo + pnpm, tsconfig/tailwind/prettier presets, CI.
  • shared-types:Enums + canonical Error Contract (R2) — 6 tests.
  • ui / supabase / db:Tokens + StatusDot/ProgressRing; Realtime hook (R3); Prisma db-pull.
  • Schema:Migration Set A + RLS + state-machine RPC + gate evaluator.
Wave D₀Done

Dev-Admin Dashboard — built first

  • Cockpit:apps/dev-admin — 3 tabs, traffic-light KPIs, burndown, 100-KPI catalog.
Burst #1Done

validation-engine, ui kit, web base, Set B

  • validation-engine:6 pure gates + readiness + ceiling (38 tests).
  • ui kit:14 product components (ovals, ack-ladder, Mission Control, nugget timeline).
  • apps/web + worker:Homepage + worlds; pg-boss worker; Set B migration.

13 sub-agents

Burst #2Done

Full web app + BE migrations + tests + devops

  • apps/web:Event dashboard, Mission Control, create wizard, role views, write APIs.
  • Backend:Migrations 0003–0006 (node SM, vendor gov, readiness, immutability).
  • Quality + DevOps:Tests, Playwright scaffold, native-PG script, Dockerfiles, README.

30 sub-agents

Burst #3Done

Write-path APIs + Error-Contract UX

  • Write APIs:nodes/roles/invitations/nuggets/instructions/acks/tasks/alerts.
  • UX:ErrorPanel + TransitionControl ("Next locks + why"), Slot Machine, Ripple.
  • Observability:@uploz/observability + health endpoints + docs.

23 sub-agents

Burst #4Done

Cockpit live-data + drift + E2E + security

  • Cockpit:Live env/coverage/drift wiring + /api/status.
  • AI Drift Monitor:Lint detecting direct DB writes bypassing RPC (R1/R5).
  • Security:Security review + threat model + runbook docs.

16 sub-agents

Burst #5Done

Production Docker (self-hosted Supabase)

  • Compose:Full self-hosted Supabase + apps + Caddy (auto-HTTPS).
  • Ops:Migrate-runner, secrets generator, backup/restore, GHCR release CI, bootstrap.

13 sub-agents

Burst #6Done

MVP02 backend depth

  • Engine:Critical-path, impact-preview, escalation policy.
  • Schema + worker:Escalation, notifications, presence, audit triggers; @uploz/notifications.

15 sub-agents

Burst #7Done

Frontend completeness

  • Event pages:Map(ripple), dependencies, alerts, readiness, roles-matrix, vendor.
  • Dev-Admin:KPIs-explorer, status, RTM, waves, velocity pages.

18 sub-agents

Bursts #8–10Done

backend-2 + i18n/auth + quality

  • backend-2:Generic rule-engine, override, replay, vendor multi-node, SQL critical-path.
  • frontend-2:i18n EN/HE/HI + RTL, auth middleware, command palette, a11y.
  • quality:k6 + Lighthouse, @uploz/test-utils, more tests, security/perf docs.

42 sub-agents

Wave DDone

backend-3 + frontend-3 (PWA) + quality-2

  • backend-3:Clusters, i18n templates, analytics views, retention, scheduler.
  • frontend-3:Engine wired into UI (critical-path/forecast); PWA shell; export.
  • quality-2:Observability/test-utils tests, CodeQL, USER-GUIDE/ADRs/CHANGELOG.

39 sub-agents

Wave EDone

Security (RLS) + MVP02 UX + observability/E2E

  • E1 security+data:JWT→RLS enforced client, auth routes, rate-limit, demo-seed (170 web tests).
  • E2 MVP02 UX:Escalation timeline, offline queue+sync, applied-a11y, HE/HI fill.
  • E3 obs+E2E+design:GlitchTip/PostHog/OTel seams, green Playwright, component gallery.

38 sub-agents

Wave FDone

Real-data path fix + auth/JWT + /creator redesign

  • Data path:JWT keys derived from secret at boot; Supabase-standard role grants (migration 0088) — event pages now render real data.
  • Migrations:Set advanced to 0001–0088 (all applied).
  • Design:Yin-yang /creator redesigned with a proper S-curve.

12 sub-agents

StagingDone

Staging DEPLOYED & live (62.169.27.202)

  • Container:Single-image uploz-staging up — web :8090, dev-admin :8091, supabase-api :8095 (swarmiq-os untouched).
  • Build:Both apps GREEN — web 192 static pages, dev-admin 101.
  • Seed:3 events (DRAFT / REHEARSAL_READY / COMPLETED), 8 nodes, 43 roles, 17 alerts, 14 nuggets, 31 activity rows.

8 sub-agents

Wave GIn Progress

Post-deploy hardening (open bugs)

  • Roles route:/event/[id]/roles returns HTTP 404 — fix in progress.
  • GoTrue auth:Real email+password login incomplete (auth schema missing identities/sessions tables).
  • SMTP:Self-hosted SMTP not wired — magic-link emails do not deliver yet.
  • Readiness:Scores show 0% — worker readiness compute not populating snapshots.
  • Realtime:Out-of-scope for the single-image build (no live push).

5 sub-agents

Wave UXIn Progress

Cockpit redesign — sidebar IA + strategic screens (Session C)

  • Navigation:Left Sidebar + per-section Sub-tabs (8 groups) replacing the flat 23-tab strip; curated nav.ts source of truth; usePathname active-state; mobile drawer; Uploz logo.
  • Landing:Cockpit rebuilt: status band (Demo Readiness / countdown / MVP% / critical bugs / env health) + Feature Readiness + Delivery Metrics + tiled burndown/gantt/focus/env grid.
  • Charts:Pure-SVG LineChart, StackedBarChart, StatusStrip, WorldMap added to packages/ui (no charting lib).
  • Strategy:New Strategy section: Vision, Personas, Use Cases, Competitive (+ Content moved here).
  • AI & Swarm Ops:New top-level category: Agent Performance / Success Rate / Cost / Collaboration / Failures (static telemetry; live agent_runs migration pending Session A number).
  • Multi-site:Demo Readiness, Feature Readiness, Deployment Map, Digital Twin, Event Simulation screens.

18 sub-agents

Timeline & burndown

Sprint plan against the build window, and remaining-task burndown by wave.

Sprint timeline

Sprint 0 — Rails

Sprint 0.5 — Dev-Admin Dashboard

Sprint 1 — Event spine + Creative entry

Sprint 2 — Validation (6 gates) + readiness

Sprint 3 — Channels, tasks, vendor, Nuggets

Sprint 4 — Alerts + ack ladder + Health Timeline

Sprint 5 — Mission Control Action Board

Sprint 6 — Harden + dress rehearsal

Burndown

1209060300FoundB1B2B3B4B5B6B7B8-10WaveDWaveEDeployFixes

Environments

Where each piece of the stack currently stands.

Web app (STAGING)

http://62.169.27.202:8090

Live · 192 static pages built green · event pages render real seeded data

Dev-Admin (STAGING)

http://62.169.27.202:8091

Live · 101 static pages built green · this cockpit

Supabase API (STAGING)

http://62.169.27.202:8095

Migrations 0001–0088 applied · JWT keys derived at boot · role grants in 0088

Staging DB (seeded)

container: uploz-staging

3 events · 8 nodes · 43 roles · 17 alerts · 14 nuggets · 31 activity rows

Realtime / SMTP

single-image build

Out-of-scope: no live push; self-hosted SMTP unwired (magic-links undelivered)

CI (GitHub Actions)

github.com/TalWayn72/Uploz/actions

ci + quality + codeql + release workflows

Top open risks

Most severe first. Full register lives on the Risks page.

1 open3 mitigating1 monitoring
Single-VPS single point of failureCriticalMitigatingInfrastructure · likelihood Medium · Platform

The whole stack — web, worker, Postgres, Redis — rides one VPS. A host outage, disk failure, or noisy-neighbour stall takes the entire product down with no automatic failover.

Mitigation: Nightly off-host backups with restore drills, a documented one-command rebuild, and a costed warm-standby plan to lift before the first paid event.

DPDP data-residency exposureHighMitigatingCompliance · likelihood Medium · Compliance

India's DPDP Act constrains where personal data may live and how it is processed. A VPS or backup region outside the permitted boundary, or an unreviewed sub-processor, is a regulatory exposure.

Mitigation: Pin compute and backups to an approved region, maintain a sub-processor register, and gate any new vendor behind a residency review before integration.

Live-verification coverage gapHighMitigatingQuality · likelihood Medium · QA

Core flows are exercised by automated tests, but the live event-day path (compressed clocks, realtime fan-out, web push) has thin end-to-end coverage against real infrastructure, so regressions can reach a live event.

Mitigation: A scheduled live-verification run against a production-shaped environment, with a go/no-go gate before each event window and alerting on the verification job itself.

Self-hosted email warmup / deliverabilityHighOpenDeliverability · likelihood High · Growth

Running our own outbound mail means a cold IP and domain reputation. Without a staged warmup, transactional mail (verification, invites, receipts) lands in spam or is throttled by major providers.

Mitigation: Staged volume warmup with SPF/DKIM/DMARC aligned, seed-list monitoring, and an ESP fallback ready to switch the transactional stream if reputation degrades.

iOS web-push reliability gapMediumMonitoringNotifications · likelihood High · Web

iOS only delivers web push to home-screen-installed PWAs and silently drops permission edge cases. Users who never add to home screen get no live event alerts, undermining the realtime promise.

Mitigation: Detect install state, prompt add-to-home-screen at the right moment, and fall back to email/SMS for critical event alerts when web push is unavailable.

Uploz Dev-Admin · illustrative project-tracking state · generated 30 September 2026 at 11:43