Uploz · Project Status Report
Build Status — for Stakeholders
Generated 30 September 2026 at 11:43 · 12 days to demo target
Headline progress
Blended delivery, sprint-scope and wave completion.
Delivery
118 of 120 scoped tasks landed
Sprint scope
7 of 8 sprints complete
Waves
14 of 16 delivery waves done
Quality — automated tests
Passing tests and measured coverage per package.
| Package | Tests | Notes |
|---|---|---|
| validation-engine | 2374 | 108 files: 6 gates + readiness/ceiling + critical-path/forecast/override/rule-registry/advanced. (+3 todo) |
| worker | 777 | 23 files: jobs (readiness/kpi/escalation-tick/escalation/presence), schedulers, dispatch. (+5 skipped) |
| web | 938 | Route handlers, snapshot mapping, authed queries, auth-helpers, rate-limit. |
| shared-types | 274 | Enums, Error Contract (parseRpcResult), contract shapes. |
| ui | 865 | Component render tests + status helpers. |
| notifications | 274 | Dispatcher, channels (email/web-push/sms stub + Twilio), severity. |
| observability | 178 | Logger, timing, error-reporter, analytics, tracing seams. |
Delivery waves
Each wave was one dependency-aware parallel agent burst.
Rails + base packages (orchestrator-built)
- Monorepo:Turborepo + pnpm, tsconfig/tailwind/prettier presets, CI.
- shared-types:Enums + canonical Error Contract (R2) — 6 tests.
- ui / supabase / db:Tokens + StatusDot/ProgressRing; Realtime hook (R3); Prisma db-pull.
- Schema:Migration Set A + RLS + state-machine RPC + gate evaluator.
Dev-Admin Dashboard — built first
- Cockpit:apps/dev-admin — 3 tabs, traffic-light KPIs, burndown, 100-KPI catalog.
validation-engine, ui kit, web base, Set B
- validation-engine:6 pure gates + readiness + ceiling (38 tests).
- ui kit:14 product components (ovals, ack-ladder, Mission Control, nugget timeline).
- apps/web + worker:Homepage + worlds; pg-boss worker; Set B migration.
13 sub-agents
Full web app + BE migrations + tests + devops
- apps/web:Event dashboard, Mission Control, create wizard, role views, write APIs.
- Backend:Migrations 0003–0006 (node SM, vendor gov, readiness, immutability).
- Quality + DevOps:Tests, Playwright scaffold, native-PG script, Dockerfiles, README.
30 sub-agents
Write-path APIs + Error-Contract UX
- Write APIs:nodes/roles/invitations/nuggets/instructions/acks/tasks/alerts.
- UX:ErrorPanel + TransitionControl ("Next locks + why"), Slot Machine, Ripple.
- Observability:@uploz/observability + health endpoints + docs.
23 sub-agents
Cockpit live-data + drift + E2E + security
- Cockpit:Live env/coverage/drift wiring + /api/status.
- AI Drift Monitor:Lint detecting direct DB writes bypassing RPC (R1/R5).
- Security:Security review + threat model + runbook docs.
16 sub-agents
Production Docker (self-hosted Supabase)
- Compose:Full self-hosted Supabase + apps + Caddy (auto-HTTPS).
- Ops:Migrate-runner, secrets generator, backup/restore, GHCR release CI, bootstrap.
13 sub-agents
MVP02 backend depth
- Engine:Critical-path, impact-preview, escalation policy.
- Schema + worker:Escalation, notifications, presence, audit triggers; @uploz/notifications.
15 sub-agents
Frontend completeness
- Event pages:Map(ripple), dependencies, alerts, readiness, roles-matrix, vendor.
- Dev-Admin:KPIs-explorer, status, RTM, waves, velocity pages.
18 sub-agents
backend-2 + i18n/auth + quality
- backend-2:Generic rule-engine, override, replay, vendor multi-node, SQL critical-path.
- frontend-2:i18n EN/HE/HI + RTL, auth middleware, command palette, a11y.
- quality:k6 + Lighthouse, @uploz/test-utils, more tests, security/perf docs.
42 sub-agents
backend-3 + frontend-3 (PWA) + quality-2
- backend-3:Clusters, i18n templates, analytics views, retention, scheduler.
- frontend-3:Engine wired into UI (critical-path/forecast); PWA shell; export.
- quality-2:Observability/test-utils tests, CodeQL, USER-GUIDE/ADRs/CHANGELOG.
39 sub-agents
Security (RLS) + MVP02 UX + observability/E2E
- E1 security+data:JWT→RLS enforced client, auth routes, rate-limit, demo-seed (170 web tests).
- E2 MVP02 UX:Escalation timeline, offline queue+sync, applied-a11y, HE/HI fill.
- E3 obs+E2E+design:GlitchTip/PostHog/OTel seams, green Playwright, component gallery.
38 sub-agents
Real-data path fix + auth/JWT + /creator redesign
- Data path:JWT keys derived from secret at boot; Supabase-standard role grants (migration 0088) — event pages now render real data.
- Migrations:Set advanced to 0001–0088 (all applied).
- Design:Yin-yang /creator redesigned with a proper S-curve.
12 sub-agents
Staging DEPLOYED & live (62.169.27.202)
- Container:Single-image uploz-staging up — web :8090, dev-admin :8091, supabase-api :8095 (swarmiq-os untouched).
- Build:Both apps GREEN — web 192 static pages, dev-admin 101.
- Seed:3 events (DRAFT / REHEARSAL_READY / COMPLETED), 8 nodes, 43 roles, 17 alerts, 14 nuggets, 31 activity rows.
8 sub-agents
Post-deploy hardening (open bugs)
- Roles route:/event/[id]/roles returns HTTP 404 — fix in progress.
- GoTrue auth:Real email+password login incomplete (auth schema missing identities/sessions tables).
- SMTP:Self-hosted SMTP not wired — magic-link emails do not deliver yet.
- Readiness:Scores show 0% — worker readiness compute not populating snapshots.
- Realtime:Out-of-scope for the single-image build (no live push).
5 sub-agents
Cockpit redesign — sidebar IA + strategic screens (Session C)
- Navigation:Left Sidebar + per-section Sub-tabs (8 groups) replacing the flat 23-tab strip; curated nav.ts source of truth; usePathname active-state; mobile drawer; Uploz logo.
- Landing:Cockpit rebuilt: status band (Demo Readiness / countdown / MVP% / critical bugs / env health) + Feature Readiness + Delivery Metrics + tiled burndown/gantt/focus/env grid.
- Charts:Pure-SVG LineChart, StackedBarChart, StatusStrip, WorldMap added to packages/ui (no charting lib).
- Strategy:New Strategy section: Vision, Personas, Use Cases, Competitive (+ Content moved here).
- AI & Swarm Ops:New top-level category: Agent Performance / Success Rate / Cost / Collaboration / Failures (static telemetry; live agent_runs migration pending Session A number).
- Multi-site:Demo Readiness, Feature Readiness, Deployment Map, Digital Twin, Event Simulation screens.
18 sub-agents
Timeline & burndown
Sprint plan against the build window, and remaining-task burndown by wave.
Sprint timeline
Sprint 0 — Rails
Sprint 0.5 — Dev-Admin Dashboard
Sprint 1 — Event spine + Creative entry
Sprint 2 — Validation (6 gates) + readiness
Sprint 3 — Channels, tasks, vendor, Nuggets
Sprint 4 — Alerts + ack ladder + Health Timeline
Sprint 5 — Mission Control Action Board
Sprint 6 — Harden + dress rehearsal
Burndown
Environments
Where each piece of the stack currently stands.
Web app (STAGING)
http://62.169.27.202:8090
Live · 192 static pages built green · event pages render real seeded data
Dev-Admin (STAGING)
http://62.169.27.202:8091
Live · 101 static pages built green · this cockpit
Supabase API (STAGING)
http://62.169.27.202:8095
Migrations 0001–0088 applied · JWT keys derived at boot · role grants in 0088
Staging DB (seeded)
container: uploz-staging
3 events · 8 nodes · 43 roles · 17 alerts · 14 nuggets · 31 activity rows
Realtime / SMTP
single-image build
Out-of-scope: no live push; self-hosted SMTP unwired (magic-links undelivered)
CI (GitHub Actions)
github.com/TalWayn72/Uploz/actions
ci + quality + codeql + release workflows
Top open risks
Most severe first. Full register lives on the Risks page.
The whole stack — web, worker, Postgres, Redis — rides one VPS. A host outage, disk failure, or noisy-neighbour stall takes the entire product down with no automatic failover.
Mitigation: Nightly off-host backups with restore drills, a documented one-command rebuild, and a costed warm-standby plan to lift before the first paid event.
India's DPDP Act constrains where personal data may live and how it is processed. A VPS or backup region outside the permitted boundary, or an unreviewed sub-processor, is a regulatory exposure.
Mitigation: Pin compute and backups to an approved region, maintain a sub-processor register, and gate any new vendor behind a residency review before integration.
Core flows are exercised by automated tests, but the live event-day path (compressed clocks, realtime fan-out, web push) has thin end-to-end coverage against real infrastructure, so regressions can reach a live event.
Mitigation: A scheduled live-verification run against a production-shaped environment, with a go/no-go gate before each event window and alerting on the verification job itself.
Running our own outbound mail means a cold IP and domain reputation. Without a staged warmup, transactional mail (verification, invites, receipts) lands in spam or is throttled by major providers.
Mitigation: Staged volume warmup with SPF/DKIM/DMARC aligned, seed-list monitoring, and an ESP fallback ready to switch the transactional stream if reputation degrades.
iOS only delivers web push to home-screen-installed PWAs and silently drops permission edge cases. Users who never add to home screen get no live event alerts, undermining the realtime promise.
Mitigation: Detect install state, prompt add-to-home-screen at the right moment, and fall back to email/SMS for critical event alerts when web push is unavailable.
Uploz Dev-Admin · illustrative project-tracking state · generated 30 September 2026 at 11:43